Building software

Compare an authored answer with supplied records. Keep supported claims, correct contradictions and leave unknowns visible.

Original fictional records and scripted feedback. No model is running; no message, code or approval is sent.

First case

Choose a release-note draft that says what the supplied tests actually cover.

Fictional notes

  1. Note 1

    Commit demo-a17: 12 of 12 basket unit tests passed.

  2. Note 2

    Commit demo-a17: offline quantity-0 check failed; previous total remained.

  3. Note 3

    No browser accessibility or production checks were run.

Authored answer: All checks pass. The change is accessible and safe to deploy.

Which plan matches these notes?

Choose a proposal before reading its rationale.

Plan A

For demo-a17, 12/12 unit tests passed and the offline quantity-0 check passed. Accessibility and production checks were not run; deployment readiness remains open.

Needs revision. Note 2 records an offline failure. The unit results do not replace that check.

Plan B

For demo-a17, 12/12 unit tests passed and the offline quantity-0 check failed. Accessibility and production checks were not run; deployment readiness remains open.

Fits the records. This preserves both the unit passes and the offline failure, plus the unrun checks.

Plan C

For demo-a17, 12/12 unit tests failed and the offline quantity-0 check passed. Accessibility and production checks were not run; deployment readiness remains open.

Needs revision. Note 1 records unit passes, while Note 2 records the offline failure. Both are reversed here.

Changed case

Reconcile a newer report with an older failure while keeping untested areas explicit.

Fictional notes

  1. Note 1

    demo-a17 failed the offline quantity-0 check.

  2. Note 2

    demo-b18: 12/12 unit tests and the offline quantity-0 check passed.

  3. Note 3

    No accessibility, load or production check was run for demo-b18.

Authored answer: The offline check still fails, so demo-b18 cannot be reviewed.

Which plan matches these notes?

Choose a proposal before reading its rationale.

Plan A

demo-b18 passed 12/12 unit tests and the offline check. The earlier offline failure belongs to demo-a17. Accessibility, load and production checks remain unrun.

Fits the records. The latest passing report names demo-b18. It does not cover the three unrun areas.

Plan B

demo-b18 passed 12/12 unit tests and the offline check. The earlier offline failure belongs to demo-a17. Accessibility and load checks passed; production checks remain unrun.

Needs revision. Note 3 lists accessibility and load as unrun, not passed.

Plan C

demo-a17 passed 12/12 unit tests and the offline check. The later offline failure belongs to demo-b18. Accessibility, load and production checks remain unrun.

Needs revision. The passing and failing versions are swapped. Read the version attached to each result.

Takeaway

  1. Split the answer into claims you can check.
  2. Match each claim to a dated record.
  3. Distinguish supported, contradicted and not established.
  4. Revise the answer so uncertainty travels with the claim.

Paper practice is self-checked; independent demonstration has not been assessed.

Lesson quiz self-check

Practice: verification

1 point for each correct answer; 0 for wrong or unanswered. No penalties. The denominator is every question, including unanswered questions. These are practice scores, not a measure of broader competence.

Note 1: Lint passed for demo-s4. Note 2: Integration tests were not run for demo-s4. A draft says all integration checks passed.

Which replacement matches the report?

  • demo-s4 passed lint; its integration tests are not recorded as run in this report.
  • demo-s4 passed integration; its lint checks are not recorded as run in this report.
  • demo-s4 passed lint; its integration tests are recorded as failed in this report.
Answer and explanations

Correct: demo-s4 passed lint; its integration tests are not recorded as run in this report. Lint has a passing result. Integration has no run, so neither pass nor failure is established.

Needs revision: demo-s4 passed integration; its lint checks are not recorded as run in this report. This swaps the tested and untested groups.

Needs revision: demo-s4 passed lint; its integration tests are recorded as failed in this report. An unrun test is not a recorded failure.

Note 1: Integration tests passed for demo-s5. Note 2: No integration run is supplied for demo-s4.

Which version-specific update is supported?

  • demo-s4 passed integration; demo-s5 remains untested by the supplied integration records.
  • demo-s5 passed integration; demo-s4 remains untested by the supplied integration records.
  • demo-s5 failed integration; demo-s4 remains untested by the supplied integration records.
Answer and explanations

Needs revision: demo-s4 passed integration; demo-s5 remains untested by the supplied integration records. The supplied passing version is demo-s5.

Correct: demo-s5 passed integration; demo-s4 remains untested by the supplied integration records. The pass belongs to demo-s5. It does not supply a result for demo-s4.

Needs revision: demo-s5 failed integration; demo-s4 remains untested by the supplied integration records. The demo-s5 result is passing, not failing.